BUILT BELOW.
CONNECTED ABOVE.
A closer look at the commercial electrical infrastructure supporting Kroger’s above-ground fleet fueling facility, completed in collaboration with SPATCO Energy Solutions.
MORE THAN A
POWER CONNECTION.
Our scope included a transformer, outdoor distribution panel, disconnects, an H-frame equipment rack, fueling equipment power and control connections, emergency shutdown controls, and grounding and bonding.
The installation also included electrical connections for tank monitoring equipment and conduit pathways for communications and cameras. Specialized raceways and sealing fittings supported the requirements of the classified fueling areas.
- 01 Distribution equipment and disconnects
- 02 Equipment power and controls
- 03 Emergency shutdown connections
- 04 Monitoring and communications pathways
- 05 Classified-location raceways and fittings
THE WORK IN DETAIL.
01Site preparation
02Equipment rack
03Electrical connections
04Site electrical equipment
05Underground conduit work
Project documentation · Click any photograph to view the larger image.